The Challenge

Park East Tower’s Homeowners Association (HOA) saw the rise of EV ownership as both an inevitability and an opportunity. As demand grows for EV charging stations for multiunit dwellings, the board needed a scalable, future-proof solution. With limited existing electrical capacity and a growing number of residents inquiring about charging options, the board needed a scalable, future-proof solution.

ev charging stations for multiunit dwellings

The building had a unique set of challenges:

  • Electrical Capacity Constraints 
    The building’s electrical system had limited spare capacity, requiring careful planning to add EV charging.
  • Manual Billing Burden
    The HOA treasurer personally read sub-meters and billed EV owners monthly or quarterly.
  • Fairness Concerns
    The board wanted to ensure EV drivers paid only for their usage, without costs being passed to non-EV residents.
  • Scalability
    Any solution had to accommodate phased growth—without expensive infrastructure overhauls.

The HOA formed a dedicated EV Charging Committee that included EV owners and engineers. They worked with an electrical engineering consultant, surveyed residents on their EV adoption timelines, and assessed options. The survey showed a slow but steady growth in EV demand—just a few new EV owners per year—but the board wanted to act now to prepare for the long term.

The HOA committed to a significant first-phase investment. Rather than electrifying every parking space upfront, they opted for a phased approach—installing new infrastructure now, then expanding as demand grows.

The Selection Process

The HOA, with guidance from their consultant, developed a vendor checklist of around 40 criteria. This covered everything from scalability and load balancing to billing automation, resident support, and integration with the building’s electrical system.

They evaluated multiple vendors but found only one that could deliver on every requirement: Wevo Energy.

Key factors in Wevo’s selection included:

EV Charging Stations for Multiunit Dwellings
  • Automated, Hassle-Free Billing
    Wevo bills residents directly and reimburses the HOA for electricity costs, removing the manual workload.
  • Scalable Architecture 
    The system could grow from a handful of chargers to dozens without re-engineering.
  • Advanced Load Balancing 
    Critical for avoiding peak load issues in summer heatwaves.
  • Proven Success in Large-Scale Deployments 
    The committee even consulted with an engineer from a 1,000-space EV project in Tel Aviv using Wevo.

“Wevo was the only vendor that met every single one of our criteria—around 40 in total. They offered the scalability, billing, and load management we needed to future-proof this building.”

The Solution

Wevo implemented a resident-specific, metered charging program:

  • Installed new electrical panels on the 4th floor of the garage to support phased expansion.
  • Required residents to purchase OCPP-compliant chargers compatible with Wevo’s platform.
  • Connected each charger to Wevo’s cloud-based management system for real-time monitoring and billing.
  • Enabled AI-powered load balancing to ensure the building’s electrical system wouldn’t be overloaded, even during peak summer usage.
Park East Tower Multi Unit Dwelling EV Charging
EV Charging Stations for Multiunit Dwellings

Resident Participation Model:

  1. Pay for the conduit run from the panel to their parking space (cost varies based on garage level).
  2. Purchase the charger hardware.
  3. Pay a monthly Wevo subscription fee

The Results

By implementing Wevo’s approach to ev charging stations for multiunit dwellings, Park East Tower positioned itself to meet resident demand for years to come.

  • Zero Administrative Burden 
    The HOA no longer tracks usage, issues bills, or collects payments.
  • Financial Fairness 
    EV drivers pay for exactly what they consume; non-EV owners aren’t subsidizing charging.
  • Capacity for Decades 
    Infrastructure supports up to 30–40 additional chargers without repeat investment.
  • Strategic Growth 
    Chargers are installed as residents request them, preventing wasted infrastructure while ensuring immediate availability.
  • Reliable Operations 
    Early billing glitches were quickly resolved by Wevo’s support, reinforcing trust in the system.
Park East Tower EV Charging

“The real win for us isn’t the number of chargers we have today—it’s knowing we can scale for decades without starting over.”

Looking to future-proof your own property with EV charging?

Explore more of our EV charging case studies to see how Wevo Energy is helping communities, workplaces, and businesses simplify EV charging management.

SHARE

We thought that you would be interested in reading these articles:

Case Studies

Customer Case Study: Liberty Wines

Liberty Wines is pushing the boundaries of sustainability in the wine sector by integrating large-scale solar power with intelligent EV charging. The result: dramatically lower operational costs, real-time energy optimization, and a self-sustaining facility that sets the benchmark for environmental stewardship in logistics and distribution.

Talk to our Specialist

Fill in the form below to book a 30 minute no-obligation consulting session.

Your information will be processed as detailed in our privacy policy.

No Risk, No Hassle!

Skip to content